LIVE
BREAKING
Italy Hit by Nationwide General Strike Over Wages and Public SpendingCOP31 Food Systems: Agriculture Talks Stall While New Pledges LaunchChina Holds Back from Taking the Lead on Climate at COP31Russian Missiles Crash in Poland During Allied Drills, Tusk Calls It Deliberate ProvocationFrance and Sweden Hold First Joint Nuclear Deterrence ExerciseCOP31’s Wind Roadmap: From a Record 165 GW to 4 TW by 2035Pat Cummins Keeps Cricket Australia Backing as Captain Amid Sandpapergate StormIran Claims Control of Waters 500km Beyond Strait of HormuzUK and EU Agree Brexit Reset Deal on Youth Mobility, Food Trade and Carbon MarketsPakistan and Türkiye Begin Offshore Energy Search as Oruç Reis Docks in KarachiCOP31 Final Day: $24.4 Billion in Climate Action Pledges as the Deal Stays UnfinishedBukele Registers for Third Term as El Salvador PresidentTürkiye’s 300 Youth Climate Envoys Carry a Generation’s Demands to COP31’s Final DayNepal PM Balendra Shah to Visit India for First Bilateral Trip, Meet ModiRussia Launches Massive Kyiv Bridges Attack, Killing FiveCOP31 Climate Champions Close the Action Agenda: “Science Calls, the Action Agenda Delivers”Magnitude 5.1 Earthquake Strikes Near Soledad in Central CaliforniaTaiwan Flags Nearly 2,700 China-Linked Accounts to Meta Ahead of ElectionsCOP31’s Final Day: Closing Plenary Under Way as Green Zone Hosts Its Last EventsEthiopia-Eritrea Tensions Escalate as Drone and Artillery Strikes Hit BadmeItaly Hit by Nationwide General Strike Over Wages and Public SpendingCOP31 Food Systems: Agriculture Talks Stall While New Pledges LaunchChina Holds Back from Taking the Lead on Climate at COP31Russian Missiles Crash in Poland During Allied Drills, Tusk Calls It Deliberate ProvocationFrance and Sweden Hold First Joint Nuclear Deterrence ExerciseCOP31’s Wind Roadmap: From a Record 165 GW to 4 TW by 2035Pat Cummins Keeps Cricket Australia Backing as Captain Amid Sandpapergate StormIran Claims Control of Waters 500km Beyond Strait of HormuzUK and EU Agree Brexit Reset Deal on Youth Mobility, Food Trade and Carbon MarketsPakistan and Türkiye Begin Offshore Energy Search as Oruç Reis Docks in KarachiCOP31 Final Day: $24.4 Billion in Climate Action Pledges as the Deal Stays UnfinishedBukele Registers for Third Term as El Salvador PresidentTürkiye’s 300 Youth Climate Envoys Carry a Generation’s Demands to COP31’s Final DayNepal PM Balendra Shah to Visit India for First Bilateral Trip, Meet ModiRussia Launches Massive Kyiv Bridges Attack, Killing FiveCOP31 Climate Champions Close the Action Agenda: “Science Calls, the Action Agenda Delivers”Magnitude 5.1 Earthquake Strikes Near Soledad in Central CaliforniaTaiwan Flags Nearly 2,700 China-Linked Accounts to Meta Ahead of ElectionsCOP31’s Final Day: Closing Plenary Under Way as Green Zone Hosts Its Last EventsEthiopia-Eritrea Tensions Escalate as Drone and Artillery Strikes Hit Badme
Climate

Egypt Clears 1.8 GW of Wind Power with Golden Licences for Two Gulf of Suez Projects

News Desk 2Published October 30, 2026
Egypt Clears 1.8 GW of Wind Power with Golden Licences for Two Gulf of Suez Projects
Share this story

Cairo, Egypt — Egypt’s Cabinet has approved golden licences for two wind power projects with a combined capacity of 1.8 gigawatts (GW) in the Red Sea Governorate and the Gulf of Suez, clearing a major regulatory hurdle for private-sector renewable energy in the country.

The approvals, granted at the Cabinet’s weekly meeting and reported on 28–29 October 2026, cover two 900-megawatt (MW) wind farms. Both projects will sell their electricity to the Egyptian Electricity Transmission Company (EETC).

Two 900 MW projects

The first licence was granted to Shadwan Wind Power, an Egyptian joint-stock company, to develop, construct, manage, operate and maintain a 900 MW wind farm in Ras Shukeir in the Red Sea Governorate. The project is scheduled for completion by 31 March 2028.

According to the Cabinet, the Shadwan project is expected to create about 2,500 jobs for engineers, workers and technicians during construction, along with 50 permanent positions during its 25-year operational period. Priority will be given to workers from the Red Sea Governorate and neighbouring areas.

The second licence covers Shokeir Wind Energy’s 900 MW wind project in the Gulf of Suez, to be developed under a build-own-operate (BOO) model. It is scheduled for completion by 1 November 2028, following a 24-month construction phase, and is expected to create about 800 jobs during construction and 25 permanent jobs over its 25-year operating life.

Wind turbines along the Gulf of Suez coast in Egypt

What a golden licence means

A golden licence, formally known as a single approval, is a government authorisation mechanism established under Egypt’s Investment Law No. 72 of 2017. It allows an eligible company to obtain one Cabinet-issued approval to establish, operate and manage a project, instead of securing separate approvals from different government authorities.

The licences are regulatory milestones rather than completed investments. As industry reporting on the approvals notes, they do not by themselves guarantee financing, construction completion or grid connection — those steps still depend on further investment and infrastructure readiness.

Part of a wider renewable push

The approvals form part of Egypt’s efforts to expand renewable energy generation through private-sector partnerships, attract investment, accelerate sustainable development and strengthen the national electricity grid. In the same week, preliminary financing was also agreed for the 1 GW Dandara solar project in Egypt, according to Renewables Now, underlining the pace of activity in the country’s clean-energy sector.

The Gulf of Suez is one of Egypt’s most attractive areas for large-scale wind power because of its strong wind resources, and the two new projects add to a growing pipeline of utility-scale wind capacity along the Red Sea coast.

Key Facts

  • Combined capacity approved: 1.8 GW, from two 900 MW wind projects.
  • Shadwan Wind Power, Ras Shukeir, Red Sea Governorate: completion scheduled by 31 March 2028.
  • Shokeir Wind Energy, Gulf of Suez, build-own-operate model: completion scheduled by 1 November 2028.
  • Both projects will sell electricity to the Egyptian Electricity Transmission Company (EETC).
  • Golden licences are single Cabinet approvals under Investment Law No. 72 of 2017.
  • Expected jobs: about 2,500 construction jobs at Shadwan and about 800 at Shokeir, plus permanent operating roles.

Related reading: China’s wind and solar capacity passes 2 terawatts.

Frequently Asked Questions

Related Stories

Planet & environment

Climate & Sustainability

News, stories and solutions driving change towards a greener and more sustainable planet for future generations.

COP31 Food Systems: Agriculture Talks Stall While New Pledges Launch
Featured story

COP31 Food Systems: Agriculture Talks Stall While New Pledges Launch

As COP31 reaches its final day in Antalya, food systems have had a split outcome: the agriculture negotiations stalled, while new food and water pledges launched on the sidelines.

Read full story

GREEN JOURNALISM

Every Action Counts

Small steps today, big impact tomorrow.

Explore more stories